The LM6000 gas turbine, included in the GE Vernova LM6000VELOX packaged solution is planned to operate on 100 percent hydrogen at the Whyalla hydrogen power plant in the Upper Spencer Gulf, South Australia.
Viper Innovations sponsored, exhibited, and presented at the Society for Underwater Technology (SUT) Perth Branch Subsea Controls Down Under Conference which took place on the 28th – 30th October in Perth, Western Australia.
The joint venture led by Webuild will design and build a section of the line with two parallel tunnels, each approximately 10 kilometres long, and related works in the eastern outskirts of the city.
The trial of the electric HiLux double cab will see it deployed at BHP’s Port Hedland operations in Western Australia where it will be used in a range of applications traditionally performed by diesel-powered light vehicles.
The 219 MW / 877 MWh battery, the largest in Western Australia to date, will be instrumental in supporting electricity reliability as the State transitions to renewable energy.
The partnership reinforces both companies’ commitment to delivering electromobility solutions that exceed customer expectations throughout the life of the vehicle, built on battery circularity.
This extension continues support to the Royal Australian Navy, Australian Army and Royal Australian Air Force deployed nodes which KBR has provided since 2021.
The project has involved retro-fitting the prill tower1 with an irrigated fibre-bed scrubber2 to capture particles of AN produced during the manufacturing process.